For ERP partners, IT providers and integrators

A plan your clients can promise from, without touching their ERP.

You know the plant and its ERP. We run the planning product. Together, a manufacturer goes from a day of spreadsheets to an approved answer.

Onboarding a plant

Four steps, all outside the ERP

1

Schedule the exports

The CSV reports the ERP already makes. Any ERP that can schedule reports.

2

Confirm the mapping

Unbrick drafts it from the files; you answer its open questions with the plant. Unmapped codes stop the load.

3

Check at the plant

The connector validates every table, count and checksum. A broken export never leaves the building.

4

Push on a schedule

On a schedule, with a key for that plant. Every push is on record in Unbrick.

Who does what

PartnerUnbrick
Find the ERP reports, schedule the export✓advise
Answer mapping questions with the plant✓draft the mapping
Install and schedule the connector✓runbook
First-line questions from the plant✓second line
Hosting, updates, backups (hosted)✓
Planning engine, product, roadmap✓

Try it this week

  • Your own account on the partner sandbox, rebuilt every night
  • A partner kit: synthetic ERP exports and the mapping Unbrick drafts from them
  • A connector key, so you can push your own test exports
What your clients see

The demo that sells the project

Once the first load runs, the plant manager can watch their own shop on the plant map, follow a late order to the lot that sets its date, and try a solver’s proposal on the whole plan. That conversation is a lot easier than the one about another report.

  • Plant map, order journeys, sequence board, staffing scenarios
  • Plan engines with open-source solvers, running inside the deployment
  • All from the same exports you set up, with nothing written back unless the client asks for it

What the plant manager can do on day one

  • Watch their own shop move on the plant map
  • Follow a late order to the lot that sets its date
  • See the work in process in dollars, once rates are set
  • Try a solver’s proposal on the whole plan